DermaPure – Fit Out & Refurbishment

Crittle glazed partitioning at DermaPure

Dermapure

Since its conception in 2005 Dermapure has been so much more than an independent distributor of some of the world’s leading skincare brands. Dermapure is a dynamic, forward-thinking business in the skincare sector, supplying world-leading brands to UK clinics and spas. Their exceptional skincare ranges come from some of the best skincare brands from the USA, Australia, and the world.

Their Needs

Sussex and Surrey Partitioning Ltd (SSP) were approached by Dermapure in August 2021 as they had acquired a new unit in Brooklands and wanted to revamp and redesign the premises to suit their expanding needs.  It was an extensive project and SSP engaged the work with enthusiasm and expertise.

The Project

On the Ground floor SSP installed stud partitioning to create a corridor, boiler housing and a storage cupboard.

On the First floor SSP created an open plan kitchenette as well as a new training room, large office area, and a staff room with additional kitchen; this was constructed using a mixture of stud partitioning and full height frameless crittle glazed partitioning. SSP installed glass partitioning to form a corridor and divide the training room and office area. Within the training room, a large vanity unit was fitted with double basins on stone worktops; this was designed and built by SSP to accommodate 2 therapy beds for use during training sessions.

All decoration to the stud partition walls is tape and jointed, and two coats of emulsion were applied to all existing walls and the new ground floor corridor block wall.

SSP Installed suspended ceilings throughout the new ground floor corridor area using a metal grid suspended ceiling system and lay in mineral fibre tiles. SSP also repaired and replaced suspended ceiling on first floor, after the removal of various existing walls and cupboards.

SSP reconfigured the cloakroom on the first floor by installing a new back to wall pan with a concealed cistern, a new vanity unit, and walls were tiled to half height with white metro tiles and black grout.

After removing and disposing of existing carpet tile, SSP installed new flooring in the first-floor training area, lobby, corridor, WC, and staff room, with Karndean Vangough Ebony flooring. In addition, new contract carpet tile was laid in the office areas and stairwell. The new corridor on ground floor was also fitted out with carpet tiles, after allowing for prep work and the application of a self-levelling compound.

In the Tea Making Area, SSP installed two wide bases with draws and two wall units, complete with a courtz worktop. A stainless-steel sink was fitted complete with a boiler/filter tap, which was connected to the existing waste and cold feeds, and a Metro tile splash back was fitted to the worktop areas.

In the Staff Room SSP installed three wide base units, one of which was a draw-line unit, as well as three wall units complete with a courtz worktop. A long breakfast bar seating area was fitted using a matching courtz worktop. A stainless-steel sink complete with mixer tap was fitted and connected to the existing waste and cold feeds. A Metro tile splash back was fitted to the worktop.

In the wash-hand to training area SSP Installed two vanity units complete with sinks and mixer taps, connected to the existing waste and cold feeds. A splash back was also fitted to the worktop.

SSP also designed and installed air conditioning and fresh air ventilation to the first-floor large office and Training Room, as well as the Staffroom.

All required electrical work was also undertaken by SSP.

Want to see how we can help you maximise your space?

Give us a call on – 01444 220 525 or click here to email us for obligation-free advice!

The Outcome

The project works undertaken at Dermapure by SSP is highly professional and aesthetically impressive, in particular the crittle glazed partitioning which looks fantastic.

Dermapure are pleased with their new, light and airy, modern offices.